Technical resource · Reviewed November 2026

Bearing RFQ Checklist for China Suppliers

A field-by-field RFQ checklist that helps buyers obtain comparable bearing quotations from China, including technical, quality, packing, delivery and commercial requirements.

Short answer: an effective bearing RFQ is an acceptance brief, not a request for a price against a part number. It should define the full bearing configuration, quantity, quality evidence, packing, delivery point, documents and commercial assumptions so every supplier quotes the same scope.

Why a part number is not enough.

Two bearings with the same bore, outer diameter and width can differ in internal design, seal or shield, cage, clearance, precision, lubrication, marking and surface protection. In cross-reference situations, the proposed substitute may fit the shaft and housing while changing axial location, speed capability, contamination protection or installation method.

A short RFQ usually produces a fast price, but not necessarily a comparable one. One supplier may quote a basic industrial bearing, another may include inspection, branded packing and export documents, and a third may assume a different Incoterms rule or payment currency. The buyer then compares numbers that describe different scopes.

Core fields for a China bearing RFQ.

RFQ field Information to provide Why it changes the quote
Buyer and destination Company, delivery country, postal code and named delivery place Freight, tax, documents and service coverage
Product identity Full reference, drawing, photo or original marking Prevents an unapproved comparable
Dimensions Bore, outer diameter, width and any assembly dimensions Confirms the basic geometry
Configuration Seal/shield, cage, clearance, precision, bore type, lubrication and special features Changes material, process and test requirements
Application Equipment, load, speed, temperature, contamination and mounting conditions Supports a safe technical review
Quantity Trial quantity, annual volume and delivery schedule Affects material planning, setup and price breaks
Quality acceptance Standard, drawing, critical characteristics, records and sampling plan Defines what “accepted” means
Marking and packing Brand, reference, barcode, label, bag, box, carton and pallet requirements Changes tooling, labour and packaging cost
Delivery Incoterms 2020 rule, named place, requested shipment date and partial-shipment rule Changes cost and risk allocation
Documents Invoice, packing list, certificate, inspection record, origin document or other required data Affects compliance and administration
Commercial terms Currency, payment milestone, quotation validity and warranty expectation Makes offers financially comparable

Build the technical package.

Attach the drawing or controlled specification if one exists. If the buyer only has a competitor reference, provide photos of all visible markings, measured dimensions and the equipment application. State whether an exact replacement is required or whether a technically justified alternative can be reviewed.

For an assembly, include the housing, shaft, mating parts, snap-ring position or overall height. A bearing that measures correctly on the bench can still fail if the axial location or mounting arrangement is different. The bearing cross-reference guide explains how to structure a comparable review.

Define the acceptance criteria before asking for a price.

Acceptance should cover more than “good quality”. State the characteristics that will be measured, the instrument or method where relevant, the sampling rule, the records required and the response to a nonconforming result. If the order is safety- or performance-critical, identify the special characteristics that require a higher inspection level.

Use the bearing inspection checklist as a starting point, then add product-specific requirements. For private-label orders, approve the marking and packaging specification together with the bearing sample.

Make every quotation answer the same questions.

Ask suppliers to quote by quantity break and to show whether the following are included:

  • Bearing, marking and packaging as specified.
  • First-article or sample approval.
  • Inspection records and third-party inspection if required.
  • Incoterms rule and named place.
  • Estimated production lead time and shipment window.
  • Payment milestones and quotation validity.
  • Any deviation, exception or proposed alternative.

A supplier that cannot explain a difference should not be treated as offering the same product. A clear exception is more useful than a vague claim of equivalence.

Use an RFQ response matrix.

Evaluation area What to compare Evidence requested
Technical fit Exact reference or documented alternative Drawing review and deviation list
Quality Inspection plan, records and acceptance rule Sample record and batch traceability
Packaging Marking, label, carton and pallet control Approved artwork and packing sample
Delivery Production, inspection, shipping and customs milestones Written schedule and shipment plan
Commercial Currency, payment, validity and claim route Quotation and draft contract terms
Communication Technical owner and change notification Named contact and escalation route

RFQ message template.

Subject: RFQ — [bearing reference or project name]

Please quote: [reference / drawing], quantity [trial] and [annual estimate], configuration [seal, clearance, cage, precision], marking and packing [attachments], delivery to [country and postal code], using [Incoterms rule and named place].

Please state: unit price by quantity, currency, quotation validity, lead time, payment milestones, included inspection records, proposed deviations and any technical alternative.

Acceptance: the approved drawing, sample and inspection plan form part of the order. Any change in product, marking, packing or manufacturing source must be notified in writing before shipment.

Signals that a quotation is incomplete.

  • A price is given without currency, Incoterms, quantity break or quotation validity.
  • The supplier cannot identify the proposed bearing beyond a generic description.
  • “Equivalent” is used without a written comparison of seal, clearance, cage, precision or mounting features.
  • Inspection records or packing requirements are described as standard without showing an example.
  • The supplier will not state whether the quoted price includes the requested marking, test or document.

Frequently asked questions

What should a bearing RFQ include?

Include the full reference or drawing, dimensions, bearing configuration, application, quantities, acceptance criteria, marking and packing, destination, Incoterms rule, documents and commercial assumptions.

How do I compare bearing quotes from different China suppliers?

Normalise the technical specification, included inspection, packing, delivery scope, payment terms and quantity breaks. Then compare the total landed and lifecycle cost rather than the unit price alone.

Can a supplier quote an equivalent bearing without an exact reference?

Yes, but the supplier should document the proposed alternative and explain differences in dimensions, internal design, seal, clearance, cage, precision and application. The buyer should approve the comparison before ordering.

Send a complete bearing RFQ

Product families

Continue through
the catalog.

Review bearing families by design, application and replacement route before sending an RFQ.

Start with a reference or drawing

Send the bearing detail.
We will do the sourcing work.

Share a bearing number, dimensions, annual volume or OEM requirement. Our export team reviews fit, packing and delivery before quoting.

Open an RFQ
Request a bearing quote